Below are the 90% construction plans from Orange County to add a sidewalk to the west side of Econ from University southward:
Aug 29 2014 Econ Sidewalk Engineering Plans
This page provides convenient links to building and construction rules and regs which may affect our lakefront. Lakefront construction projects have unique regulations to protect the waterbody from runoff and septic system contaminants.
Examples:
- Variance required for structures within 50 feet of the Normal High Water Mark.
- Site runoff should be directed to berm and swale when possible.
Orange County Building Permit Lookup
Orange County Permits & Licenses
Orange County Lakeshore & Wetland Impact Permits
Orange County Dock Construction Code
Orange County Enviromental Health - Septic Tanks